Monday, April 30, 2012

23 FTS

The routing work is finished and next up will be the sanding and shaping of the cabinet doors.




- Posted using BlogPress from my iPhone4

Thursday, April 26, 2012

Guillaume

Updating the last picture with the proper orientation. I've also finished the shaping of the doors.



- Posted using BlogPress from my iPhone4

Tuesday, April 24, 2012

Have to stop running jobs for a few days

One of the parts on my machine went today and I just ordered a replacement.  It should hopefully arrive this week and I'll be back up by the weekend.


Saturday, April 21, 2012

Cabinet for Guillaume

I finished the machining and sanding of this logo. I will try to get some more work in on this one tomorrow and have it prepped for finishing.



- Posted using BlogPress from my iPhone4

Friday, April 20, 2012

Pack's Inn is going out ;)

Wrapped up the backboard I've been working on. Got some new light strips that are quite bright and do a great job of lighting up the dart board. As always, light directly overhead will work best with a dart board that has recessed wires. My prop board has the wire web floating over the bristle so it does cast shadows on the lower numbers.





- Posted using BlogPress from my iPhone4

Thursday, April 19, 2012

CH Logo

This cabinet is completed and features the Cole Haan company logo.


- Posted using BlogPress from my iPhone4

Tuesday, April 17, 2012

Bailey Dartboard Cab is finished

The final assembly is wrapped up and this cabinet is ready to ship out this week.













- Posted using BlogPress from my iPhone4

Pack's Inn

The staining and finishing are complete. I have to cut the back and apply the felt and then install the lights. Should be ready to ship tomorrow.


- Posted using BlogPress from my iPhone4

Monday, April 16, 2012

CH Needle in Final stages

I have finished the painting and staining so it's onto applying the finish coat. I should be able to assemble this cabinet for shipping by the end of the week.


- Posted using BlogPress from my iPhone4