Thursday, December 15, 2011

Ready to start polyurethane

I have the painting done and I'm moving onto the polyurethane work now.




- Posted using BlogPress from my iPhone4

Indian Chief paint

Started the stain and paint work. Today should be the day I finish up the painting and staining.



- Posted using BlogPress from my iPhone4

Sunday, December 11, 2011

Indian Chief

Some final sanding and routing is needed and I will then start staining and painting the wood on Tuesday.




- Posted using BlogPress from my iPhone4

Sunday, December 4, 2011

The NY Yankees

I forgot yo publish the final pictures of this cabinet so here they are.








- Posted using BlogPress from my iPhone4

Greskovic

These are the final pictures and update for this cabinet. This one will also be shipping out on Tuesday.







- Posted using BlogPress from my iPhone4

Casa De Lake

Here are the final pictures for this cabinet. It will be shipping out on Tuesday.








- Posted using BlogPress from my iPhone4

Tuesday, November 15, 2011

Cabinets in the finishing room

There are 3 cabinets down in the finishing room which I haven't issued an update on for a bit. Sorry about that.

The NY Yankees cabinet is ready to ship. I will be attaching the doors and hardware this morning and issue another update.




The Casa de Lake Brewery cabinet is almost finished and will be ready toward the weekend.




The Greskovic cabinet is almost ready for polyurethane coating and should be ready early next week.



- Posted using BlogPress from my iPhone4

Friday, November 4, 2011

NY YANKEES

I am moving onto the polyurethane this weekend and should have this cabinet ready to ship out by early next week.



- Posted using BlogPress from my iPhone4

Wednesday, October 19, 2011

NY Yankees

The logo is painted and I'll be applying se white stain to finish it off before I stain the surrounding wood.




- Posted using BlogPress from my iPhone4

MTN Cabinet

This cabinet was completed and delivered.






- Posted using BlogPress from my iPhone4

Monday, October 10, 2011

Yankees Cabinet

Started painting the logo today. This one is going to look pretty sharp when it's all done!



- Posted using BlogPress from my iPhone4

Greskovic Engraving

The engraving work has been painted and is now finished. Next I'll be cutting and routing the doors to size and prepping for stain.



- Posted using BlogPress from my iPhone4

MTN staining

The staining work is complete and now I will move into the polyurethane.






- Posted using BlogPress from my iPhone4

Wednesday, October 5, 2011

Staining

I'm in the process of staining the cabinet. The inside is finished up as far as staining work is concerned. Started the exterior side yesterday and should have this wrapped up by tomorrow.










- Posted using BlogPress from my iPhone4

Monday, October 3, 2011

MTN Update

U started applying the dark walnut stain this morning. Here are a couple if pictures of the doors. The interior of the routing work will receive a highlighting stain to add some contrast.






- Posted using BlogPress from my iPhone4

Saturday, October 1, 2011

Current set of jobs




This project is coming along nicely so far. I am getting better at making some of these designs turn out the way I want them to with my CNC machine.




This one is a little tough to see because of the glare. The wood has a coating on it which I use to minimize any paint from getting into areas that will be stained later on.




This project is ready for stain which I will start to apply tomorrow. This one uses commercially made patterns which were chosen by the customer.



- Posted using BlogPress from my iPhone4

Tuesday, September 27, 2011

MTN

After waiting a week for a new bit to arrive, this cabinet is starting to finally take shape. Some more sanding and cutting of the material is needed before moving in for staining. There are also two more engravings on the inside of the doors which I'll post some pictures of later tonight.


- Posted using BlogPress from my iPhone4

Saturday, September 17, 2011

USC Maple cabinet

This cabinet is ready to ship out on Monday. It features a satin finish and painted logos. The cabinet also features Blum 170degree hinges and LED light strips.








- Posted using BlogPress from my iPhone4

Tuesday, September 6, 2011

Shop is back up and running

Well, the hurricane did some pretty severe damage all around my area but we were lucky in the sense that we only had some basement flooding to deal with. I've been able to dry out completely and put my shop back in order but I have a backlog of emails to answer and cabinets which need to be started. I'm trying to answer a few emails per night along with trying to catch up with the work.

Please hang in there if you sent me an email. If you have a deadline before October 15th, you should be aware I might not be able to meet it. If you do have such a deadline, please call me @ 845-418-2760 and leave a message with your info so I can prioritize your email and call you back.

After Irene, this was a ball field in my hometown of Suffern. The water is about 9 feet deep!

Tuesday, August 30, 2011

Hurricane Irene Update

Due to the hurricane that came through the N.Y. area, my schedule has been affected. All my shop tables were used for storage of tools, wood and household items. As it turns out, we fared well compared to many surrounding neighborhoods. I only had 5" of water so no property damage but it will still take me most of this week to dry out the floor and walls and put things back in order.

I'm also trying to find out what help I can provide to friends that have lost property due to rising flood waters. This will affect my available time and I'll post more info but for now my communication via direct email will be slower than normal and new cabinet work will also be on hold temporarily.




- Posted using BlogPress from my iPhone4

Tuesday, August 23, 2011

Provider Cabinet

Finished, finally.







- Posted using BlogPress from my iPhone4

Thursday, August 11, 2011

USC cabinet and VRC-30

The USC cabinet features the Trojan head on the exterior and two additional college logos on the inside.



These two pictures were taken after the colonial maple stain was applied.







The VRC-30 Providers cabinet is going to a Navy Squadron.

This cabinet is in the staining room and should be ready to ship at the end of the weekend.


- Posted using BlogPress from my iPhone4

Recently shipped items

Two cabinets recently shipped out.

All American Day Charitable Fund



I also shipped out a cabinet to the 96 Bomber Squadron.




- Posted using BlogPress from my iPhone4

Thursday, July 21, 2011

Re-staining 96 BS

I applied a darker coat of stain to this project today and will finish this up tomorrow.

There is some painting that still needs to be done before I move onto the polyurethane.



- Posted using BlogPress from my iPhone4

All American Day Painting

Today I finished up the painting. It's looking pretty good and the polyurethane will be going on starting tomorrow.




- Posted using BlogPress from my iPhone4

Thursday, July 14, 2011

USC Trojans - Doors sized

The final sizing of the doors is now complete. Now the engraving looks like it is supposed to.




Just waiting to get the customers choice for the top of the doors, straight or arched.




- Posted using BlogPress from my iPhone4

All American Day Staining

I've completed the staining work on this cabinet. The shade is Sedona Red from Minwax. Next up, I will be painting the logo to match the original logo.



- Posted using BlogPress from my iPhone4

Saturday, July 9, 2011

All American Day Update

The final sanding of all parts is complete so the cabinet is moving down to the finishing area to wait it's turn. Hopefully sometime midweek I can start the staining.



- Posted using BlogPress from my iPhone4

Friday, July 8, 2011

MORE RAIN ....

*UPDATE* Thankfully, this wasn't nearly as bad as the last storm that rolled through. There was some flash flooding in my neighborhood and a little water did make it's way into the basement but nothing that required vacuuming to remove. SO, business as usual. * End of Update*

Well, I'm heading home and roads are flooded and closed everywhere. This is the radar for my area. I'm dead center of the red area. I have a feeling there will be more water seeping into the basement which means a day or two of drying out and dehumidifiers running round the clock. This will once again slow down the work on cabinets.



- Posted using BlogPress from my iPhone4

Thursday, July 7, 2011

Staining 96 BS Cabinet

Tonight I started staining the parts of the 96 BS cabinet. Tomorrow I'll flip all the pieces and stain the opposite sides.


- Posted using BlogPress from my iPhone4

USC TROJAN Cabinet

The engraving work on this project is finished. I have moved onto sanding and shaping the cabinet parts. These pictures are of the current state. The doors still need to be ripped down to their proper width once all the sanding work has been completed.




There are two engravings that will appear on the inside of the cabinet.





- Posted using BlogPress from my iPhone4